Dynacord Promatrix 6000 (84 pages)
Tags
Languages available:
No exact matches found. Please change your query
Need help?
Do you have a question about the product that is not answered in the manual?
- Receive updates on solutions
- Get answers to your question
Product description:
Frequently Asked Questions
Who is responsible for ensuring proper system installation?
The installer is responsible for ensuring proper system installation and that the system is only used by qualified personnel. The safety and functionality of the system depend on both the components and the installation process.
What are the requirements for system modifications?
Modifications to the system must be executed by authorized personnel in accordance with the safety concept and must be documented in the system documentation to ensure compliance with safety standards.
Can EN 54 and non-EN 54 devices be used together?
Yes, but they must be clearly marked to indicate which devices are EN 54 certified and which are not. This helps ensure proper system operation and compliance with safety standards.
What power supply systems are required for the system?
Only use a Power-Supply and Battery-Backup-Power-Supply-System that is certified according to EN54-4, in combination with the VACIE according to EN54-16, and is part of the Declaration of Performance (DoP) of the PROMATRIX 6000 System.
What is the purpose of the EN 54-16 standard?
EN 54-16 is a harmonized European standard for building products, specifically for voice alarm systems. It ensures that the system meets safety and performance requirements for emergency and alarm applications.
What should be done if the system is not compliant with IP30?
All open areas and holes of the cabinet that do not comply with IP30 must be closed. Use compatible cable glands, climate control, and ensure proper ventilation to maintain compliance with the IP30 standard.
What is required for the system to be certified?
The installer must complete and sign the EN 54-16 checklist, which serves as a certificate. This document must be signed by both the installer and DYNACORD to confirm compliance with safety and performance standards.
What are the access levels for the system components?
Access to the controlling and indicating equipment, such as the PVA-15CST, is access level 2 (protected by a lock), while the rear of the equipment is access level 3 (protected by a different or additional lock).
What firmware is required for the system?
The installer must ensure that certified firmware is installed and running on all system components. Information on compatible firmware versions can be found on the manufacturer's website.
What is the role of the end-user in system maintenance?
The end-user must maintain a journal for the system and ensure that all maintenance and operational procedures are followed to guarantee the system's continued compliance with safety and performance standards.
Related products from Dynacord
PCL 1125T
User manual 40 pages
PCL 1225T
User manual 40 pages
PCL 1240T
User manual 40 pages
PCL 1245
User manual 40 pages
PCL 1415
User manual 40 pages
ST 2100
User manual 3 pages
PM2600
User manual 4 pages
Eminent II
User manual 18 pages
D 12-3A
User manual 6 pages
A 2002
User manual 10 pages
PERFECT
User manual 11 pages
ECHOCORD MINI
User manual 12 pages
ECHOCORD SUPER 76
User manual 16 pages
X 1202
User manual 17 pages
X1201
User manual 17 pages
AX 903
User manual 18 pages
UV 300
User manual 18 pages
DPM 4000
User manual 20 pages
GIGANT II
User manual 21 pages
MV 506
User manual 28 pages