ABB SACE Emax 2 Serie (27 pages)
Tags
Languages available:
No exact matches found. Please change your query
Need help?
Do you have a question about the product that is not answered in the manual?
- Receive updates on solutions
- Get answers to your question
Product description:
Frequently Asked Questions
What is the purpose of this retrofitting kit?
This retrofitting kit allows for the full replacement of obsolete Entelliguard G Env1-Env3 circuit breakers with more modern Emax 2 plug-in air circuit breakers, without modifying any live parts of the switchgear.
What are the conditions for electrical compatibility?
Full correspondence of electrical characteristics (rated current and breaking capacity) is guaranteed provided that: 1. The kit selection follows technical catalogues dedicated to retrofitting products, and 2. The Entelliguard G circuit breaker has been installed in compliance with its installation manual.
Can the original switchboard design data be altered?
No, retrofitting allows only for replacing an obsolete control and protection device without altering any of the original project data of the existing switchboard. The kits are sized according to the performance of the old device.
What safety precautions should be taken before installation?
Before installing or replacing a circuit breaker, ensure that: 1. The switchgear is de-energized; 2. The existing circuit breaker is in an open position with springs unloaded; 3. Auxiliary circuits are disconnected; and 4. Confirm the user load is disconnected before removing any equipment.
What should be done when disassembling the old circuit breaker?
Completely dismantle the old circuit breaker, but keep all connection screws from its terminals to ensure proper reinstallation of new components and maintain system integrity.
Are assembly instructions for this kit a substitute for installation manuals?
No. The provided instructions are solely for assembling the retrofitting kit and do not replace the official installation, operation, or maintenance manual for the Emax 2 circuit breaker.
What tools are required to install the retrofitting kit?
Use existing hardware such as screws and bolts where possible. Ensure all fasteners are tightened properly according to specified torque values (e.g., 8.5 Nm for terminals, 20.5 Nm for supports).
How should the fixed part of the kit be installed?
Install the fixed part on supporting brackets or mounting plates in accordance with manufacturer guidelines and ensure all connections are secure to maintain structural stability.
What is recommended for handling existing fasteners during installation?
Reutilize existing screws, bolts, and hardware where applicable. Ensure that any reused components are inspected for wear or damage before reinstallation.
Can this retrofitting kit be used across different Emax 2 models?
Yes, the retrofitting kits are compatible with various Emax 2 configurations (E2.2, E4.2, and E6.2) as well as Entelliguard G Env1-Env3 circuit breakers of matching size.
Related products from ABB
2CDS200970R0032
User manual 2 pages
S2C-H10
User manual 2 pages
SACE Isomax S
User manual 4 pages
SACE S7
User manual 4 pages
SACE Tmax XT2
User manual 4 pages
SACE Tmax XT2
User manual 5 pages
SACE Tmax XT2
User manual 11 pages
SACE Tmax XT2
User manual 11 pages
SACE Tmax XT4
User manual 4 pages
SACE Tmax XT4
User manual 5 pages
SACE Tmax XT4
User manual 9 pages
SACE Tmax XT4
User manual 11 pages
SACE Tmax XT4
User manual 11 pages
SACE Tmax XT4
User manual 12 pages
SACE Tmax XT
User manual 12 pages
SACE Tmax XT
User manual 8 pages
SACE Emax 2 E6.2
User manual 13 pages
SACE Emax 2 E6.2
User manual 14 pages
SACE Emax 2
User manual 8 pages
SACE Emax 2
User manual 8 pages