Product description:
Frequently Asked Questions
What safety precautions are required when operating the generator?
The generator must be operated by qualified personnel only. Ensure the machine is disconnected from the supply and at a standstill before performing any maintenance or inspection. All operations must comply with applicable standards and regulations. Protective measures must be taken to prevent contact with rotating parts and ensure the safety of personnel.
What is the purpose of the insulation resistance test?
The insulation resistance test checks the condition of the generator windings to ensure they meet safety requirements. It involves measuring the resistance between the windings and ground using a Megger instrument. The results are compared to determine if the insulation is sufficient for safe operation.
How should the generator be stored if not used immediately?
If the generator is not used immediately, it should be stored in a clean, dry, and vibration-free area. For storage periods longer than three months, follow the recommended drying and cleaning procedures. Ensure the machine is disconnected from any power source and protected from moisture.
What is the polarisation index and how is it used?
The polarisation index (PI) is the ratio of insulation resistance measured after 10 minutes to that measured after 1 minute. It helps assess the condition of the winding insulation. A PI of 1.5 or higher indicates good insulation, while a PI below 1.5 suggests potential moisture or contamination and requires drying and cleaning.
How should the generator be connected for single-phase loads?
For single-phase loads, the generator can be connected in a star-parallel configuration. Connect the load to terminals U1/T1 and V1/T2. Ensure the generator is not used for leading loads exceeding 0.25 times the rated power in KVAR. Always follow the wiring diagrams provided for correct connections.
What are the recommended maintenance intervals for the generator?
The generator should be inspected after approximately 100 operating hours or within one year, whichever comes first. Subsequent inspections should be conducted during maintenance of the prime mover. Check for smooth operation, proper ventilation, secure connections, and ensure all fixing bolts are tightened.
How should the generator be dried if moisture is present in the windings?
To remove moisture from the windings, use methods such as internal heating, self-heating with low-voltage DC current, or oven drying. Ensure the temperature does not exceed 80°C. If using oven drying, set the temperature to 110–150°C and allow the drying process to continue for 2–4 hours depending on the initial insulation resistance.
What are the requirements for electrical connections?
Electrical connections must be secure and free from damage. Use appropriate thread-locking compounds like Loctite® 243 to prevent loosening, but ensure they do not cover electrical contact surfaces. All connections should be checked for tightness and integrity before operation.