Log in


or


google Continue with Google

Already have an account?

Telecom Behnke 50-5501 (84 pages)

0 out of 5
0 review

Tags

Loading...

Languages available:

No exact matches found. Please change your query

PDF page 1
Loading...
Need help?

Need help?

Do you have a question about the product that is not answered in the manual?

  • Receive updates on solutions
  • Get answers to your question

Ask a question

Select image (Optional)

Product description:

The Telecom Behnke 50-5501 is an intercom system designed for reliable communication in professional environments. It features a clear audio transmission system, allowing for easy and uninterrupted conversations. The device is built with durable materials to ensure long-term use and stability. It supports integration with existing communication infrastructures and is suitable for use in offices, buildings, and other locations requiring efficient intercom solutions. The system is easy to install and operate, making it a practical choice for various applications.

Frequently Asked Questions

How to install the stainless steel column series 5?

Before installation, ensure the column and the selected door station match. Pass the wiring through the column base before securing it to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 120 mm and diameter of 10 mm. Follow the manufacturer's torque specifications. Remove the three sealing strips and any protective film from the end cover. Connect the door station to the infrastructure and install it at the top of the column. Test the functionality of the door station. Insert the end cover into the column and secure it with the provided screws.

What are the installation requirements for the series 20/30 column?

Before installation, ensure the column and the selected door station match. Pass the wiring through the column base before securing it to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 12 mm. Follow the manufacturer's torque specifications. Install the column base cover, ensuring it is not added later due to ventilation slots. Pass the wiring through the column body and base cover. Secure the column to the base plate. Connect the devices to the infrastructure and test their functionality. Install the door station and cover, securing them with clamping plates. Fix the lower cover with the angle bracket. Push the base cover down.

How to install the series 50 column?

Before installation, ensure the column and the selected door station match. Remove the rear cover of the column by unscrewing the four screws on the back. Pass the wiring through the column base before securing it to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 10 mm. Follow the manufacturer's torque specifications. Install the door station and connect it to the infrastructure. Test the functionality of the door station. Reinstall the rear cover using the previously removed screws.

What is the installation process for the myintercom column?

Before installation, ensure the column and the selected myintercom door station match. Remove the four covers on the column base. Pass the wiring through the column base to the end cover before securing the column to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 10 mm. Follow the manufacturer's torque specifications. After securing the column, close the screw holes with the previously removed cover caps. Connect the door station to the infrastructure and install it in the column. Test the functionality of the door station.

How to install stiles and pylons?

Before installation, remove the rear inspection cover of the stile or pylon by opening the cylinder lock at the top. Pass the wiring through the base plate before securing the stile or pylon to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 12 mm. Follow the manufacturer's torque specifications. Connect the pre-installed Behnke devices to the infrastructure. Test the functionality of the devices. Reinstall the inspection cover and secure it with the cylinder lock. Document the key numbers of the locks for potential replacement. Refer to page 12, point 3 for columns with letterboxes.

What are the maintenance requirements for Behnke stainless steel products?

To maintain the brilliance of the stainless steel surface, regular cleaning with appropriate cleaning agents is necessary. Follow the user instructions for your stainless steel care product. If rust spots appear on the surface, they are likely to be airborne particles known as 'flying rust.' These can be easily removed with a suitable cleaning agent. To prevent corrosion damage, avoid prolonged contact with other metals.

What are the specifications for the series 5 column?

The series 5 column has a length of 70 cm, width of 70 cm, and thickness of 80 cm. The support column dimensions are 22 cm by 30 cm. The foundation area is 0.00 m². The water level is 99.00 m. The soil weight is 18.00 kN/m³, and the soil weight with water is 8.00 kN/m³. The base friction angle is 25.00°, and the internal friction angle is 25.00°. Cohesion is 0.00 kN/m². The foundation is suitable for columns up to a base width of 500 mm and depth of 152 mm.

What are the installation requirements for the series 50 column?

The series 50 column is suitable for columns up to a base width of 500 mm and depth of 152 mm. Ensure the column and the selected door station match. Remove the rear cover of the column by unscrewing the four screws on the back. Pass the wiring through the column base before securing it to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 10 mm. Follow the manufacturer's torque specifications. Install the door station and connect it to the infrastructure. Test the functionality of the door station. Reinstall the rear cover using the previously removed screws.

What are the installation requirements for the series 20/30 column?

The series 20/30 column is suitable for columns up to a base width of 500 mm and depth of 152 mm. Ensure the column and the selected door station match. Pass the wiring through the column base before securing it to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 12 mm. Follow the manufacturer's torque specifications. Install the column base cover, ensuring it is not added later due to ventilation slots. Pass the wiring through the column body and base cover. Secure the column to the base plate. Connect the devices to the infrastructure and test their functionality. Install the door station and cover, securing them with clamping plates. Fix the lower cover with the angle bracket. Push the base cover down.

What are the installation requirements for the myintercom column?

The myintercom column is suitable for columns up to a base width of 500 mm and depth of 152 mm. Ensure the column and the selected myintercom door station match. Remove the four covers on the column base. Pass the wiring through the column base to the end cover before securing the column to the foundation. Use hexagonal root screws, anchors, or bolts in the concrete foundation. Use screws with a minimum length of 180 mm and diameter of 10 mm. Follow the manufacturer's torque specifications. After securing the column, close the screw holes with the previously removed cover caps. Connect the door station to the infrastructure and install it in the column. Test the functionality of the door station.

Send answer

Related products from Telecom Behnke

Your opinion matters to us

Do you think we can improve or add something? Are there features missing or do you have suggestions for improvement? We would love to hear from you.

Give a rating

5 out of 5