Emerson Liebert MPH (66 pages)
Tags
Languages available:
No exact matches found. Please change your query
Need help?
Do you have a question about the product that is not answered in the manual?
- Receive updates on solutions
- Get answers to your question
Product description:
Frequently Asked Questions
How do I install the Liebert MPX PRC using the mounting kit?
To install the Liebert MPX PRC using the mounting kit, first insert two spring nuts into the T-slot on the back of the PRC. Then, attach the fastening button with a washer into each spring nut and tighten. Finally, secure the mounting brackets to the DCM frame using two spring nuts and two cylinder screws with toothed washers.
What tools are required for mounting the Liebert MPX PRC?
The required tools for mounting the Liebert MPX PRC include an Allen key size 5 and a slotted screwdriver 10x1.6. These tools are used to fasten the mounting brackets and secure the PRC to the DCM frame.
What is the correct position for the data bus on the power rail?
If the MPX PEM is attached to the top of the power rail, the data bus should be on the left side. If the MPX PEM is attached to the bottom of the power rail, the data bus should be on the right side. This ensures proper separation of power and data cables.
How can I mount two MPXTM PRC units side by side?
To mount two MPXTM PRC units side by side, use the mounting brackets and secure them to the DCM frame. Ensure that the power rail is properly aligned and that the fastening buttons and washers are correctly tightened to maintain stability.
What are the mounting options for the Liebert MPX PRC in the H2000 rack?
In the H2000 rack, the Liebert MPX PRC can be mounted using the supplied mounting kit. The power rail can be installed in various positions, and the mounting brackets can be adjusted to fit the specific dimensions of the rack.
What are the mounting options for the Liebert MPX PRC in the H2200 rack?
In the H2200 rack, the power rail can be mounted sunken on the side panel, which provides more space for cable management. The mounting brackets can be adjusted to fit the dimensions of the rack and ensure secure installation.
How do I install the earthing kit for the Liebert MPX PRC?
To install the earthing kit, insert the spring nuts into the T-slot on the back of the PRC. Then, attach the fastening button with a washer into each spring nut and tighten. Finally, secure the earthing kit to the DCM frame using the provided mounting brackets and screws.
What is the recommended torque for tightening the mounting screws?
The recommended torque for tightening the mounting screws is 2.8 Nm for the fastening buttons and 5.2 Nm for the cylinder screws. This ensures that the components are securely fastened without causing damage to the mounting brackets or the PRC.