Log in


or


google Continue with Google

Already have an account?

SFA SANICUBIC 2 SC (102 pages)

0 out of 5
0 review

Tags

Loading...

Languages available:

No exact matches found. Please change your query

PDF page 2
Loading...
Need help?

Need help?

Do you have a question about the product that is not answered in the manual?

  • Receive updates on solutions
  • Get answers to your question

Ask a question

Select image (Optional)

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Product description:

The SFA SANICUBIC 2 SC is a submersible pump designed for efficient water transfer and drainage applications. It features a robust construction suitable for use in challenging environments. The pump is equipped with a high-performance motor and a corrosion-resistant housing, ensuring long-lasting operation. It is ideal for use in wastewater treatment, irrigation, and industrial water management systems.

Frequently Asked Questions

What safety precautions should be taken when using the device?

The device must be used by trained personnel and children under 8 years old should not operate it. Electrical connections must be done by a qualified electrician, and the power supply must be grounded with a 30 mA differential circuit breaker. Always follow the safety instructions provided in the manual to prevent injury or damage.

What are the technical specifications for the SANICUBIC® SC units?

The SANICUBIC® SC units have varying power ratings, with single systems ranging from 3.0 kW to 7.5 kW and double systems from 4.0 kW to 8.7 kW. They operate at 400 V, have a rated current between 5.5 A and 16.9 A, and are designed for conveying wastewater with a maximum temperature of 55°C. The units have different pumping capacities and inlet/outlet connections as specified in the manual.

What are the safety instructions for maintenance and repair?

Maintenance and repair must be carried out by authorized personnel who have studied the operating instructions. The machine must be turned off and all safety devices reactivated after work. Only original spare parts should be used to ensure safety and avoid liability for any resulting damage.

What are the operating limits for the sewage lifting units?

The units are not designed for continuous operation and should only be used for intermittent periodic duty (S3 25%). The maximum permissible feed flow must always be less than the feed volume of a pump as specified on the type plate. They must not be used for conveying wastewater containing substances that attack or damage the pump or tank materials.

How should the units be transported and stored?

The units must be transported horizontally and not dropped or thrown. For storage, they should be kept in a cool, dry, frost-proof place, standing horizontally. Ensure that the units are protected from moisture and damage during transport and storage.

What is the function of the dip tube and switch box?

The dip tube in the tank compresses air until the pressure activates the switch box, which then turns on the pump. The switch box contains a toggle switch that alternates pump operation. In overload conditions, the second pump will activate. A check valve in the pressure line prevents backflow, and the switch box also includes a motor protection relay that automatically switches off the motor in case of overload.

What are the installation requirements for the units?

The installation location should be well-ventilated, dry, and frost-free. The room must be adequately sized with a height of approximately 2 to 2.5 meters. The foundation must support the weight of the unit, and the inlet line must be installed on a downhill incline. The pressure line should be installed in an arc above the flood level and then descend toward the sewer connections.

How should the electrical connections be made?

Electrical connections must comply with IEC 364 / VDE 0100 standards, including earth terminals on sockets. The connection should be carried out by a qualified electrician, and the electrical network must have a high-sensitivity FI switch (IA <30 mA). In bathrooms, DIN VDE 0100 Part 701 regulations must be followed. All electrical devices must be flood-proof in dry rooms.

What should be done before commissioning the unit?

Before commissioning, check all connections for correct installation and ensure the shut-off valve is open. Plug in the unit and check the direction of rotation by setting the switch to manual. If the pump rotates incorrectly, interchange two of the three phases. After testing, ensure the unit automatically switches on, pumps the tank empty, and switches off without water backflow.

What are the maintenance intervals for the units?

According to DIN 1986 Part 31, the units should be inspected monthly for operational capability and leakage. Maintenance intervals should not exceed 3 months for commercial systems, 6 months for multiple-family residences, and 1 year for single-family houses. Regular checks and servicing by a specialist are required to ensure proper function and safety.

Send answer

Your opinion matters to us

Do you think we can improve or add something? Are there features missing or do you have suggestions for improvement? We would love to hear from you.

Give a rating

5 out of 5
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.