Rothenberger 61701 (120 pages)
Tags
Languages available:
No exact matches found. Please change your query
Need help?
Do you have a question about the product that is not answered in the manual?
- Receive updates on solutions
- Get answers to your question
Product description:
Frequently Asked Questions
What is the purpose of the ROTEST GW 150/4?
The ROTEST GW 150/4 is a device used for pressure and leak testing of gas and water installations. It is designed for use by qualified personnel to ensure the safety and integrity of gas and water systems.
What are the technical specifications of the ROTEST GW 150/4?
The device features a manometer with a precision of 0.1 bar, and a water column measurement accuracy of 0.1 mbar. It is equipped with a water tank that is pre-filled, and the device is suitable for testing gas lines up to 150 mbar and water systems up to 1 bar.
How do I perform a self-test with the hand pump?
To perform a self-test with the hand pump, close all shut-off valves, connect the hose to the A connector, pump the system to 3 bar, wait 10 minutes for temperature equilibrium, and ensure the pressure remains stable during the test.
How do I perform a self-test with the simple blower?
To perform a self-test with the simple blower, close all shut-off valves, connect the hose to the B connector, assemble the stem system, open the B, C, and D valves, pump the system to 110 mbar, close the C valve, wait 10 minutes for temperature equilibrium, and ensure the pressure remains stable during the test.
What is the procedure for a pressure test of gas installations?
For a pressure test of gas installations, ensure all connections are sealed with metal fittings, avoid gas connections, and test before the installation is covered. Use the hand pump to reach 1 bar, wait 10 minutes for temperature equilibrium, and ensure the pressure remains stable during the test.
What is the procedure for a leak test of gas installations?
For a leak test of gas installations, ensure all connections are sealed with metal fittings, avoid gas connections, and test before the installation is covered. Use the simple blower to reach 150 mbar, wait 10-60 minutes for temperature equilibrium, and ensure the pressure remains stable during the test.
How do I adjust the nozzle pressure for gas burners?
To adjust the nozzle pressure for gas burners, connect the hose to the B connector, attach the gas device adapter, set the burner to full load, open the B and D valves, and read the actual nozzle pressure.
What is the procedure for a pre-test of water installations?
For a pre-test of water installations, close all shut-off valves, connect the hose to the A connector, attach the hose to the adapter, and pump the system to 3 bar for DN 50 or 1 bar for DN 100. Wait 10 minutes for temperature equilibrium and ensure the pressure remains stable during the test.
What is the procedure for a main test of water installations?
For a main test of water installations, close all shut-off valves, connect the hose to the B connector, attach the test plug, and pump the system to 110 mbar. Wait 10 minutes for temperature equilibrium and ensure the pressure remains stable during the test.
How should I maintain and care for the ROTEST GW 150/4?
Regularly lubricate the O-rings, connectors, and gas meter cap with the provided silicone grease. Apply grease to the expansion joints of the stems to ease assembly. Store the device in a clean, dry place to prevent corrosion and ensure proper function.