Product description:
Frequently Asked Questions
What is the maximum temperature of the heat exchanger?
The heat exchanger's maximum temperature is approximately 500 °C. The appliance may be installed in an area where the ambient temperature lies between -10°C and 40 °C.
What are the requirements for the flue gas exhaust system?
The flue gas exhaust system must have a minimum 3° pitch from the appliance. The maximum length of the intake and flue pipe is six metres, including 2x2 90° bends. Each additional right-angled bend shortens the length by 2 metres. Use 45° bends if possible. The flue gas system should be installed with a restrictor if the length is less than 3 metres.
What are the gas connection requirements?
The gas tap must be positioned within reach of the appliance. If the connection line is subject to pressures above 60mbar, this gas tap must be closed. Always blow through the gas pipe in compliance with the regulations prior to operating the appliance. If the appliance needs to be converted to a different type of gas, contact the supplier for advice.
What is the correct electrical connection for the appliance?
Installation must comply with local and national regulations. The unit is phase-sensitive and must be appropriately earthed. The appliance must be fitted with an isolator switch that interrupts phase and zero. Never allow the supply to the appliance to be interrupted by other switches, as this could result in the appliance overheating.
How should the room thermostat be installed?
The room thermostat must be located at a height of approx. 1.5m and not directly within the flow of warm air. Connect the room thermostat using a shielded cable in accordance with the wiring diagram. Incorrect connection will render the manufacturer’s warranty void.
What is the maximum length for the flue gas exhaust system?
The maximum length of the intake and flue pipe is six metres, including 2x2 90° bends. Each additional right-angled bend shortens the length by 2 metres. For type 95, the maximum length is 1 metre, including 1x2 90° bends. Use 45° bends if possible.
How do you start up the appliance?
Before starting, ensure the room thermostat is set to the minimum temperature, open the gas stop cock, and carefully purge the gas pipes. Do not use an open flame. After a pre-purge period, the automatic ignition control will produce an electric arc on the pilot burner. If the gas stop cock is closed, no flame will appear. After 4 attempts at ignition, the automatic control can be released and the same cycle can be repeated.
How do you check the burner pressure?
Use a pressure gauge connected to the gas pressure measuring nipples to check the variation in burner pressure. The variation in pressure is found in the type plate and in table [3] under 'D'. When connecting to the measuring nipples, the main burners must be temporarily turned off. The burner pressure can be corrected by adjusting the screw on the pressure regulator.
What is the procedure for cleaning the heat exchanger?
Inspect the heat exchanger externally and internally for signs of damage. Clean the exterior if necessary, taking care not to bend or damage the sensor on the safety thermostat. The interior of the heat exchanger should be cleaned if required. Clean the air discharge louvres as part of the maintenance process.
What are the maintenance requirements for the appliance?
The appliance must be subjected to maintenance at least once a year, more often if necessary. When carrying out maintenance, the appliance must have been shut down for an extended period. Make sure that you comply with all safety rules. Clean the burner tray, inspect the heat exchanger, check the flue gas fan, and clean the V-belt pulleys if required.
Related products from Mark
50-9
User manual 20 pages
30-9
User manual 20 pages
Infra
User manual 57 pages
Infra
User manual 64 pages
40-9
User manual 20 pages
GD
User manual 92 pages
GD
User manual 102 pages
GSD
User manual 92 pages
GSD
User manual 102 pages
GND
User manual 92 pages
GND
User manual 102 pages
GSE
User manual 40 pages