Log in


or


google Continue with Google

Already have an account?

ITRON Delta (72 pages)

0 out of 5
0 review

Tags

Loading...

Languages available:

No exact matches found. Please change your query

PDF page 4
Loading...
Need help?

Need help?

Do you have a question about the product that is not answered in the manual?

  • Receive updates on solutions
  • Get answers to your question

Ask a question

Select image (Optional)

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Product description:

The ITRON Delta is a measuring instrument designed for precise and reliable measurement tasks. It features a robust construction suitable for use in various industrial environments. The device offers accurate readings and is equipped with user-friendly controls for easy operation. It supports multiple measurement modes and is compatible with a range of sensors, making it a versatile tool for different applications. The ITRON Delta is built to meet high standards of performance and durability, ensuring consistent results over time.

Frequently Asked Questions

How should the meter be stored before installation?

The meter should be stored under cover in a clean, dry environment, in the horizontal position. The caps fitted in the inlet and outlet pipe must stay in place until installation.

What is the recommended level of filtration for the gas?

It is advisable to filter the gas upstream of the meter. The recommended level of filtration is 100 μm or better. Periodically check the cleanliness of the filter, especially in the case of a new installation or after work has been performed on the upstream piping.

What should be done before installing the meter?

Before installation, ensure the piping upstream of the meter is free of dust. Remove the protective caps. Ensure the direction of gas flow corresponds with the arrow on the meter body. Check that the impellers turn freely.

How should the meter be handled during installation?

The meter should be lifted only with a belt around the main body or with the eyelets. Ensure that the lubricant has been thoroughly drained from the front and the rear covers to prevent spillage into the measuring chamber.

What is the recommended lubricant for the meter?

Choose a lubricant according to the operating conditions. It should be neutral and non-detergent. Avoid over-lubrication as it can contaminate the measuring chamber, degrade the metrology, and cause damage to the bearings and impellers.

How should the lubricant be filled and drained?

Both front and rear covers must be filled with lubricant, except for the Delta Compact aluminium and Delta S1-Flow steel models, where only the front cover needs to be filled. Adjust the oil level so it passes the centre of the lowest sight for general cases. For steel-bodied meters, fill until the lubricant flows out of the level point 'L'.

What are the requirements for installing the meter in hazardous areas?

Pulse transmitters must be connected to intrinsic safe circuits according to EN 60079-11. Clean the meter head only with a cloth damped with water. All exposed aluminium parts must be protected against rust. The meter must be considered in the lightning risk evaluation. Tools used must be suitable for hazardous areas.

How should the meter be started up with a bypass?

Start with all valves closed. Slowly open the bypass valve to pressurize the downstream piping. When the pressure is balanced, slowly open the small upstream valve V1. When the pressure is balanced in the meter, slowly open the main upstream valve and close V1. Slowly open the downstream valve and check that the meter starts to register the flow. Gradually close the bypass valve and check that the flow rate doesn't exceed the meter's capacity.

How should the meter be shut down with a bypass?

Slowly open the bypass valve and then close the upstream and downstream valves on the meter line. Carefully open the small bleeder valve V2 and depressurize the meter. The pressure variation should not exceed 0.3 bar per second. Ensure sufficient ventilation as some gas remains inside the meter and the pipe.

How should the meter be started up without a bypass?

Start with all valves closed. Slightly open the upstream valve to pressurize the meter line. The pressure variation should not exceed 0.3 bar per second. When the pressure is balanced, fully open the upstream valve. Slightly open the downstream valve and ensure the meter starts to register the flow.

Send answer

Related products from ITRON

Additional user manuals for the same series

Your opinion matters to us

Do you think we can improve or add something? Are there features missing or do you have suggestions for improvement? We would love to hear from you.

Give a rating

5 out of 5
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.