Lovibond MD200 (84 pages)
Tags
Languages available:
No exact matches found. Please change your query
Need help?
Do you have a question about the product that is not answered in the manual?
- Receive updates on solutions
- Get answers to your question
Product description:
Frequently Asked Questions
How to clean the cuvette after each analysis?
After each analysis, the cuvette, lid, and stirrer must be thoroughly cleaned to prevent carryover errors. Even small amounts of reagent residue can lead to inaccurate measurements.
What should the cuvette walls be like before analysis?
The outer walls of the cuvette must be clean and dry before analysis. Fingerprints or water droplets on the light transmission areas can cause measurement errors.
Can different cuvettes be used for zeroing and testing?
Zeroing and testing must be performed with the same cuvette, as cuvettes may have minor tolerances between each other. Using different cuvettes can lead to inconsistent results.
How should the cuvette be positioned in the measurement chamber?
The cuvette must be placed in the measurement chamber so that the graduation aligns with the white triangle on the housing marking. This ensures accurate alignment for measurement.
What is the correct procedure for zeroing and testing?
Zeroing and testing must be performed with the cuvette lid closed. The lid must be equipped with a sealing ring to ensure airtight closure. Any bubbles inside the cuvette should be removed by shaking before testing.
What should be done if water enters the measurement chamber?
Water entering the measurement chamber should be avoided, as it can lead to incorrect measurement results. Ensure the chamber remains dry and free from contamination.
How to handle contamination in the transparent measurement chamber?
Contamination in the transparent measurement chamber can cause measurement errors. The light transmission areas should be checked and cleaned regularly using wet wipes and cotton swabs.
What should be done if there are temperature differences between the photometer and the environment?
Significant temperature differences between the photometer and the environment can lead to measurement errors, such as condensation forming in the measurement chamber and on the cuvette. Ensure stable environmental conditions.
What is the correct way to add reagent tablets?
Reagent tablets must be added directly from the foil into the water sample without touching them with fingers. This prevents contamination and ensures accurate chemical reactions.
What is the procedure for a new zero calibration?
To perform a new zero calibration, press the [ZERO/TEST] button for 2 seconds. This recalibrates the device and ensures accurate measurements for subsequent tests.
Related products from Lovibond
SensoDirect Salt110
User manual 12 pages
MD 100
User manual 16 pages
MD 100
User manual 184 pages
Scuba II
User manual 44 pages
Scuba2
User manual 44 pages
CheckitDirect
User manual 44 pages
CheckitDirect
User manual 64 pages
CheckitDirect
User manual 72 pages
CheckitDirect
User manual 84 pages
SD 320 Con
User manual 60 pages
LC 100
User manual 125 pages
MD110
User manual 136 pages
MD110
User manual 184 pages
MD110
User manual 304 pages
TB 210 IR
User manual 140 pages