DAB 1 SS6 (73 pages)
Tags
Languages available:
No exact matches found. Please change your query
Need help?
Do you have a question about the product that is not answered in the manual?
- Receive updates on solutions
- Get answers to your question
Product description:
Frequently Asked Questions
What is the standard for fire-fighting pump groups?
The fire-fighting pump groups comply with the EN 12845 and UNI 10779 standards, ensuring they meet specific safety and performance requirements for fire protection systems.
What components are included in the hydraulic part of the pump group?
The hydraulic part includes a preassembled manifold with flanged connections for each pump, a manometer, pump operation signal pressure switch, check valve, butterfly valve, discharge manifold with manometers, two pump start pressure switches, a pressure test circuit, and an expansion tank (if a pilot pump is included).
How should the pump group be installed?
The pump group should be installed in a well-ventilated area, protected from weather, with an ambient temperature not below 4°C (10°C if motor pumps are also installed) and not exceeding 40°C. Ensure the group is positioned for easy maintenance.
What is the electrical connection procedure for the pump group?
Ensure the voltage and frequency match the motor's rating to avoid damage. Connect the power cable to the control panel's terminal block, prioritizing the earth wire. Follow the electrical schematic provided in the attached documentation for the control panel and pilot pump central unit.
How do you check the operation of the electric pump?
Turn the main switch of the electric pump to ON, check the pump's rotation direction by briefly pressing the start button, keep the discharge closed, and record the start pressure. Ensure the pump operates correctly and the pressure is within the required range.
What is the weekly maintenance procedure for the fire-fighting pump group?
Perform a weekly check to verify and record the pressure of the manometers, water levels in the tanks, and the correct position of the shut-off valves. Follow the procedure to test the automatic start of the pumps by opening the manual start valve, checking the pump start pressure, and closing the valve again.
What are the requirements for the annual inspection of the fire-fighting pump group?
During the annual inspection, verify the pressure and flow rate of the pumps using the values indicated on the technical data plate. Ensure all components are functioning correctly and the system meets the required standards.
How do you adjust the pressure switches for the pump group?
For the Danfoss KP pressure switch, loosen the two screws, remove the cover, adjust the upper pressure limit using the cross-head screw, and set the lower pressure limit using the hexagonal screw. For the Klockner Moeller MCS pressure switch, adjust the start and stop pressures by rotating the calibration knob, and set the differential pressure as needed.
What should be done if a pump in the group fails to start?
Check if the main power switch or auxiliary circuit breaker is turned off, inspect the thermal-magnetic circuit breakers for faults, and ensure the electrical circuit is not interrupted. If there are significant water losses in the system, ensure the pressure is restored above the pressure switch opening threshold.
Related products from DAB
Divertron
User manual 76 pages
Divertron
User manual 121 pages
Divertron
User manual 64 pages
DIVERTRON 650
User manual 121 pages
DTRON3
User manual 206 pages
DIVERTRON 900
User manual 121 pages
3 MICRA HS
User manual 19 pages
ACTIVE E 30/80 (6)
User manual 20 pages
ACTIVE E 50/50 (6)
User manual 20 pages
ACTIVE EC 25/80 (6)
User manual 20 pages
ACTIVE J 62
User manual 20 pages
ACTIVE J 62
User manual 224 pages
ACTIVE J 62
User manual 156 pages
ACTIVE J 82
User manual 20 pages
ACTIVE J 82
User manual 156 pages
ACTIVE J 82
User manual 224 pages
ACTIVE J 92
User manual 20 pages
ACTIVE J 92
User manual 156 pages
ACTIVE J 92
User manual 224 pages
ACTIVE J132
User manual 20 pages